In order to view all images, please register and log in. This will also allow you to comment on our stories and have the option to receive our email alerts. Click here to register
18.03.2010

CTE delivers its largest lift

CTE has delivered its first 62 metre B-Lift 620HR to Rome based Tecnoalt and Elevateur both of which are divisions of Venpa3 and who will share the machine.

The 620HR can be mounted on a four-axle 32 ton truck and is equipped with a five section main boom plus three section telescopic jib, which is controlled by an electronic management system. Overall length is just under 11.7 metres.
Please register to see all images

The first CTE B-Lift 620R


The maximum outreach is 35 metres with main boom horizontal, while a more practical 29 metres is available at up to 43 metres of height
Please register to see all images

The unit features a five section boom and three section jib


The electronic management system automatically measures outriggers spread and the load in the platform to set the lifts maximum outreach. The new lift was handed over by Lorenzo Cipriani, president of CTE and Gianpaolo Piovan CTE sales manager.
Please register to see all images

(L-R) Lorenzo Cipriani- president CTE, Massimo Bellini- general manager TecnoAlt, GianPaolo Piovan -sales manager CTE and Marco Scarano -sales manager Elevateur at the hand-over


The new lift will go straight to work on the new “City of Sport” project at Tor Vergata in Rome, which has been designed by the architect Santiago Calatrava.

Comments