13.06.2012
Skyking launches Hybrid Van mount
UK based GSR/Palfinger Platforms distributor Skyking will launch a 12.5 metre hybrid van mounted aerial work platform at Vertikal Days in two weeks time.
The Skyking 125RA is based on the company’s most popular van mount lift, which uses a GSR superstructure, following 12 months of in-service trials.
Please register to see all images
The new Skyking 125RA Hybrid
The new hybrid conversion, which will be offered on all of the company’s new van mounts, enables the operator to arrive at a job, switch off the engine and operate the platform on battery power. A simple foot pedal switches the power source so that the platform can be operated using the normal controls in the basket.
The Skyking developed system will also be offered as a conversion for existing machines.
The system offers a number of major benefits, as well as the obvious reduction in noise and emissions, the fuel savings can also be significant. It will also provide the opportunity to carry out emergency repairs in residential areas overnight with significantly less disturbance.
Power comes from two batteries with sufficient capacity to handle at least full 20 cycles of the platform. When the vehicle is in operation a split charger directs charge not required for vehicle to the platform’s batteries, charging them up during transit. An independent 13 amp charger is also fitted, allowing the batteries to be charged when the vehicle is not in use.
The charging system is automatic and only operates when a top up is required. The kit is enclosed in a protective cover with battery condition indicators and charging lights visible through an inspection window. Installation kits are initially available for Iveco, Mercedes, Ford and Fiat vans.
Please register to see all images
The new Skyking 125RA Hybrid
Comments