19.01.2018
Bluelift for US Embassy
The US Embassy in Santiago, Chile has taken delivery of a 13 metre Bluelift C 13 spider lift.
The C 13 has a platform capacity of 230kg, which is available with up to 5.2 metres of outreach. Maximum outreach is 7.5 metres with an unrestricted capacity of 80kg. The spider lift was delivered by local distributor VertiTek, and will be used for general maintenance work at the embassy.
Please register to see all images
Pablo Olguin from the facility management team at the Embassy (L) with Ricardo Carrasco Pérez from VertiTek
Comments