24.04.2026

tracked carrier for CPR

Scottish civil engineering company Complete Paving Requirements (CPR) placed an order for a 1.5 tonne Almacrawler ML 1.5 FX compact tracked carrier today during the ScotPlant exhibition in Edinburgh.
The GGR stand at ScotPlant

The ML 1.5 FX - ordered through dealer GGR - features two 5.3kW AC electric two speed direct drive track motors, which, along with the other electrics, are waterproof rated to IP67. The transporter has an overall width of 700mm, an overall length of 1.17 metres, with a deck height of 500mm. The overall weight is 465kg.

The transport deck is steel checker plate and can be slid forward to provide easy access to the components. Maximum travel speed is 2.8kph with a ground clearance of 40mm and 45 degrees gradeability.
Harley Parkin of GGR with William Black of CPR

Power is supplied by a 55Ah maintenance free AGM battery pack, with an integrated onboard charger that takes the batteries from empty to fully charged in six hours. An Autec radio remote controller is standard.

Based in Renton, north west of Glasgow, CPR is a resurfacing and civil engineering contractor working within construction and railway maintenance.

Comments