In order to view all images, please register and log in. This will also allow you to comment on our stories and have the option to receive our email alerts. Click here to register
12.11.2021

Alimak/Peri scaffold hoist

Mastclimber and hoist group Alimak has teamed up with scaffold and formwork manufacturer Peri to develop the STS 300 rack and pinion scaffold component hoist.

Designed for use with the Peri Up system scaffold, the STS 300 features a single mast and a detachable 880mm by 1.23 metre platform with a 300kg capacity. It is able to lift all the various Peri Up components, including the large staircases, to lift heights of 12, 24, 36 or 48 metres, with a 2.2kW motor providing hoist speeds of 17 metres a minute. The platforms also feature four swivel casters for improved manoeuvrability on the ground, and can also be stacked for easier transportation and storage.
Please register to see all images

Alimak and Peri have teams up to develop the STS 300 scaffold hoist


The company claims just two scaffolders - one at the bottom loading and unloading the boxes and another at the top installing the scaffold - are able to erect up to 300 square metres of scaffolding a day.
Please register to see all images

The STS 300 can lift Peri Up components up to 300kg to heights of 12, 24, 36 or 48 metres


Alimak construction division vice president, said: “We are continuously focusing on adding customer value and are very pleased to be able to launch this new scaffolding product, which will not only improve productivity and efficiency for our customers, but also provide a safer, smoother and an overall better scaffolding working environment for scaffolders.”

Peri board member Thomas Imbacher, added: “We are very pleased to have this partnership with Alimak Group. The Alimak STS 300 will enable scaffolders to improve their entire logistic process, starting from the warehouse towards the jobsite and backwards. Due to the innovative approach, waiting times decrease and it is easy to assemble and dismantle scaffolding with a team of two scaffolders.”

The Alimak STS 300 will initially be available in Germany before gradually being rolled out to the rest of the world.

Comments