UK based Durham lifting has taken delivery of a 34 tonne Multisec Multi-point heavy lift beam.
The Multi-Point 34T features a capacity of 34 tonnes and a 10.5 metre span. it maintains full load capacity at sling to vertical angles of 30 and 45 degrees and features ISO1328 compliant forklift pockets, while spacing on the beam aids in even load distribution and efficiency.
The new beam arriving at Durham Lifting's depot
Wan Djawad, technical director at Durham lifting said: “We understand the challenges our clients face when it comes to lifting heavy, complex loads. The Multi-Point 34T beam is built to handle demanding conditions while offering the flexibility required for different lifting configurations. Whether it’s lifting large, irregular loads or ensuring weight is evenly distributed across multiple points.”
Comments